Answer Posted / arun k
in relization part we will configure the system as per client requirement in dev server
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How are time management and payroll are integrated?
Explain PI sheet.
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
How do you integrate HR (employee) with PP?
What is Backflush, the places where the backflush is used?
Difference between byproduct and co-product.
How to move to the realization phase?
What is a ‘work center’ in pp?
list the important tables used in pp.
How is indian slab and us slab?
How the processing time is calculated in a wc when both labor, machine categories exist?
Explain the mrp group and their uses.
SPRO path for order, confirmation or requirement class.
What is the use of mrp pp evaluations?
In project the customization is comes under which phase?