What is mrp area and mrp group. tell me differences
Answer Posted / arun k
mrp group contains control parametre like strategy group , planning time fence, planning horrizon and consumption type etc so we create mrp group by using t code oppr , and assign the mrp group to materials for define a control paramete in mrp 1 view in MM
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
Explain how can you create production order without routing and bom?
Tell one biggest task for you
Integration between PP and QM Module.
Tell some standard order types and what configure done for current project
Different types of consumption based planning.
What is qualification deficiency?
What is the need of mrp list if the stock requirement list is already given?
What is the SPRO Path for requirement class and req. type?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is the t-code for changing production order and to display production order?
what are the constraints of Variant configuration?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
You want to insert an inspection check point at the end of an operation. How would you do that?