suppose a job is running for 15 minutes after that it goes to message wait? what are the impact analysis
Answer Posted / khalisha
CPU % will get increase,System will get slow and no printouts will print.
| Is This Answer Correct ? | 0 Yes | 4 No |
Post New Answer View All Answers
Interviewer asked me write down DDS for load all subfile .can anybody write dds
Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?
what is the necessary keyword needed to scroll subfile records?
give an eg of ACQ-(ACQUIRE),BIT OFF,BIT ON,DEALLOC,DUMP,FEOD,FORCE,MHHZO,MHLZO,MHLLZO,MLHZO,REL,RESET,TESTZ,TESTB,TESTN----GIVE SMALL EXAMPLE TO THE OPCODES...TO UNDERSTAND FUNCTIONING...........
How many program bind in one module....
how do I declare a table or array in rpg iv?
explain sflclr, sflend, sfldlt, and sflcsrrrn?
what is the procedure and explain about real time scenario.
what is file information data structure?
How would display prime numbers using CL program?
what is an online rpg?
What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
what is program status data structure?
which program rpg or cl is efficent to update a transaction onto a database file and why ?