PP Cut over activities are
1. Upload Bill of Material
2. Upload Work Center
3. Upload Routing
4. Open Production order upload
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is finite scheduling?
What is qualification deficiency? How will you come to know that a person does not have certain skills/qualification?
What is purpose of schedule margin key?
Control keys
Explain the process of Material costing.
How many levels of Flexible Planning are there?
What are the types of MIC?
What is routing in sap pp?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is Schedule Margin key. How floats works in scheduling?
How is indian slab and us slab?
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
What are basic dates?
Can't one material be assigned to more than one operation in a routing, why?
Why work scheduling view is required for semi-finished and finished products?