PP Cut over activities are
1. Upload Bill of Material
2. Upload Work Center
3. Upload Routing
4. Open Production order upload
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
What is Backflush, the places where the backflush is used?
Explain the gaps and the steps involved in them.
Can't one material be assigned to more than one operation in a routing?
What are the levels of batch, explain batch determination process?
Difference between PP and PI.
What is collective order. Pre requisite of the collective order?
Explain about rough cut planning
Why and how you calculate WIP?
What is SOP and types of SOP?
What is the planning time fence?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What do you mean by basic dates
Why is work scheduling required for semi finished and finished products?
What are the questions we need while we go company for analysis to implementation SAP? What we need to know generally? How can we define we need abab for improvement?
What do you mean by pooled capacity?