Scenario : I have 2 jobs say job A and Job B with parameters x and y respectively. I need to create a sequence job. If we pass parameter x then Job A should run, If we pass parameter y then Job B should run, if we dont pass any parameter then Both Job A & B should run.
Answer Posted / jaswanth
we can use nested condition along with the sequencer by giving the ANY condition to link Job A and Job B.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Define Merge?
What is the difference between passive stage and active stage?
Differentiate between odbc and drs stage?
What are the enhancements made in datastage 7.5 compare with 7.0?
Highlight the main features of datastage?
How can you write parallel routines in datastage PX?
What is use Array size in datastage
What is datastage engine?
What are the components of ascential data stage?
What are the functionalities of link collector?
How one source columns or rows to be loaded in to two different tables?
what should be ensure to run the sequence job so that if its get aborted in 10th job before 9job should get succeeded?
what is 'reconsideration error' and how can i respond to this error and how to debug this
What is the difference between in process and inter process?
Describe link sort?