adspace
Why attemperation is required in HRSG in a combined cycle
power plant?
Answer Posted / baskaran
During gas turbine load reduce time, HP superheater temperature going to high temperature at that time Attamperator using in between HP superheater 1 &2.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers