Why attemperation is required in HRSG in a combined cycle
power plant?
Answer Posted / baskaran
During gas turbine load reduce time, HP superheater temperature going to high temperature at that time Attamperator using in between HP superheater 1 &2.
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
explain how the third harmonic content of the magnetising current affects transformer design
what is restricted earth fault explain in details
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
LAPT working in alternator / generator
How do you consider that you can improve and what assistance do you need to achieve this
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
what does mean by kva rating
operation
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
What is difference between secondary Air & Tertiary Air and Their use.?
why do you consider yourself a suitable candidate for this position
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon