What is mrp area and mrp group. tell me differences
Answer Posted / rashmi kant
MRP Group
The MRP group contains all the materials from the point of view of MRP for assigning special control parameters for the total planning run. These control parameters include, for example, the strategy group, the consumption mode, and the planning horizon.
MRP Area
MRP Area represents a separate organizational area for which you can carryout MRP Separately.
An MRP area can include one or several storage locations of a plant or a subcontractor. You can define MRP areas within a plant.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Can any body explain me why work scheduling view is required for semi finished and finished products?
Mention what are the production process in sap?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
What is the output of mps run ?
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
what are the problems you faced in MRP?
List out the activities carried out in production planning?
What are the types of MIC?
What does a PP Consultant do in his/her real time?
Scheduling times can be defined in the material master record by?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
Explain variant configuration
What do you mean by basic dates
Mention what are the t-codes for creating, changing and summarizing bom?