What is mrp area and mrp group. tell me differences

Answer Posted / rashmi kant

MRP Group

The MRP group contains all the materials from the point of view of MRP for assigning special control parameters for the total planning run. These control parameters include, for example, the strategy group, the consumption mode, and the planning horizon.

MRP Area
MRP Area represents a separate organizational area for which you can carryout MRP Separately.

An MRP area can include one or several storage locations of a plant or a subcontractor. You can define MRP areas within a plant.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are all the 'sub-components' of production orders?

595


What is the use of stock requirement list?

641


How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks

2511


Why and how you calculate WIP?

1209


SPRO path for order, confirmation or requirement class.

2229






How do you get the system to update this value from the routing?

580


What is the planning time fence?

601


What are the steps of production execution process?

629


What happens to plan after it has been converted into production order?

617


What are sequence, parallel, overlapping, splitting and where can we assign these

1527


What are basic dates?

636


What do we do in the realization phase?

531


Explain schedule margin key

618


define variable cost

685


Is it possible to convert a 'multiple bom' into a 'variant bom'?

709