What is mrp area and mrp group. tell me differences
Answer Posted / rashmi kant
MRP Group
The MRP group contains all the materials from the point of view of MRP for assigning special control parameters for the total planning run. These control parameters include, for example, the strategy group, the consumption mode, and the planning horizon.
MRP Area
MRP Area represents a separate organizational area for which you can carryout MRP Separately.
An MRP area can include one or several storage locations of a plant or a subcontractor. You can define MRP areas within a plant.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are all the 'sub-components' of production orders?
What is the use of stock requirement list?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
Why and how you calculate WIP?
SPRO path for order, confirmation or requirement class.
How do you get the system to update this value from the routing?
What is the planning time fence?
What are the steps of production execution process?
What happens to plan after it has been converted into production order?
What are sequence, parallel, overlapping, splitting and where can we assign these
What are basic dates?
What do we do in the realization phase?
Explain schedule margin key
define variable cost
Is it possible to convert a 'multiple bom' into a 'variant bom'?