Answer Posted / mohamed moideen k
Cutover activity is to upload our master data from non-sap to sap server.
There are 3 types of cutover activities
1. LSMW - Legacy System Migration Workbench
2. BDC - Batch Data Communication
3. BAPI
Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
What is costing? How it is affected the pp?
What is sap pp?
what do you mean by planning time horizon
Difference between plan cost, Actual cost and target cost.
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
What do you do to run MRP for just one MRP Controller?
How is indian slab and us slab?
Integration between PP and PM module.
What is the t-code for changing production order and to display production order?
What is the standard info set?
What are the types of master views for production and planning?
What is Individual and collective requirements and differecne between them in MTO scenario?
After doing realization how we will check whether it is working or not?
What is group bom?
Explain different inspection type you used .