What is the exact meaning for under & over reinforced beams
& when they have to used..
Answer Posted / bharath
generally all the sections are designed to be balanced section. under reinforced section means the steel is less than the balanced one's where the structure is ductile(warning can be seen before failure)
.if it is over reinforce i,e steel is more than the required then the structure may fail under brittle (sudden collapse)
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
in one SQM plaster how much Cement and sand consumed in ratio 1:4
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
how to absorb to site basic corrections? which are the important correction?
How to calculate the crank rod in slab
Where is the worlds longest elevator and how long is it?
What is absolute pressure? How absolute pressure is calculated?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
pls give me some basic informations in construction of a structure?
How many bricks are there in 100cft?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
how much cement sand n bricks required in im3?and how much in plaster?
What is thumb rule in quality and quantity estimation of a Residential building??
How to cal. The weight of hollow pipe?