Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

The Hinged and Roller support is same or differnt if it is
differnt how does it differs

Answer Posted / kulbhushan

The structure member sebjected on tunged supports cen position of the beam is fixed in this case. The rxn on a hinged support may be the horizontal or incrlin king depending on the structure.

Is This Answer Correct ?    2 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please design 12.5m long dubbly beam

1894


What is command line?

1189


WHAT DLC DESIGN IN CONSTRUCTION

2087


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7733


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1765


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3106


How to calculate sand , cement quantity for 23mm thk brick work(10x10)

5192


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

2240


What is meant by cartesian coordinate system?

1167


how meny typs of renging rod?

2276


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2469


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

2351


Mention different types of roof systems?

1181


What is meaning of FREE STANDING STAIRCASE ?

3032


what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

1432