Suppose in CL we reach at end of file and again we have to reach from 1 record
Answer Posted / surya
We can use POSDBF command in CL program
This command sets the record position of the database file that is opened with OPNID(XXX) to the starting position of the database file member that is currently open.
POSDBF OPNID(XXX) POSITION(*START)
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?
write an RPG program to calculate the marks of 5 students (A,B, C, D, E)in 3 different subjects (eng, math, sci) an display on the screen
When it is desirable to describe files Internally?
what is program status data structure?
How to declare the pull button in AS/400..
Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
How can we know running job is batch or interactive?
during execution, an rpg/400 program automatically follows a sequence of operations for each record that is processed. The built-in program cycle includes the following logical steps.
Suppose we have one database file and it is used by 5 programs and in 3 program we have to add some records in datbase file s what is the impact on other program?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
How to select highest score of each subject or how to select highest income of every month?
what is the procedure and explain about real time scenario.
if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.
are there any useful c runtime apis that I can call from rpg iv?