Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is AMF panel????????

Answer Posted / deepak mishra

AMF(Automated Mains Failure) normally is called panel.When main fail our micro controller based controller(PACE ATS) sense this and gives command to DG start through Relay (PACE DG 99).In this time also sense fuel level,oil presser,dg Battery voltage,dg RPM,Mains Voltage,Dg voltage,Battery Bank voltage, Dg run Time,Temp.,load on EB, laod on DG.
when mains back again the controller will sense and gives command for DG stop automatically and also stop our set time in controller.

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why there using acb enclosure in big buildings

2036


What are motor generator sets and explain the different ways the motor generator set can be used ?

1107


what is deffrence between squirral cage and wound rotor in IM?

1913


what is the electrical?

2050


Define unilateral circuit?

1155


WHAT ARE THE CHARACTERISTICS OF AN VOLTAG AMPLIFIER

1973


How the capacitance og capacitor volatage transformer is decided?

1921


What is conventional thermal current (Ith)

4373


please send me the L&T Emb. sys. placement papers and entire details of pattren

2274


why we have and use 3 phase not 2 or 4 or other in power system?

2065


Define phase cross over?

1069


why not starting switch first connect in direct on line starter?????

1888


What is the necessary condition for stability.

1149


in Telecom DC system-why positive +ve is made earthed.and - ve is fed to load.

2627


what the function breaker failure scheme, how is it operated

1857