What is air-project parameter ? How to use in abinitio graph?
Answer Posted / abhi
AIR Project parameter is used to check in and check out process.AIR project export is used to EME to sandbox.AIR Project Import is used to Sandbox to EME Repositary.
| Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
What is the difference between partitioning with key / hash and round robin?
difference between paramaters inputparameters,Local parameters, Formal parameters, Sand box parameters,Project parameters and export parameter?
When we should use 'jobid' for commit table (Output table component?? How to use in abinitio graph?
Mention some file extensions which are used in abinitio?
Do you think effective communication is necessary for data processing?
How data is processed and what are the fundamentals of this approach?
can we perform checkin and checkout through sandbox?
How to insert/update a csv file by comparing it with another csv file? for example, i have 2 input files : ColA ColB ColC 1 A AA 2 B AB 3 C CC and second one : ColA ColB ColC 2 B BB 4 D DC Job should compare these 2 files and update the records present in first input file. so the output file will look like this: ColA ColB ColC 1 A AA 2 B BB 3 C CC 4 D DC
What is data encoding?
How you can run a graph infinitely in ab initio?
What is the purpose of having stored procedures in a data-based?
What are differences between different gde versions(1.10,1.11,1.12,1.13and 1.15)?what are differences between different versions of co-op?
What does it mean by the term 'sort component'?
How abinitio eme is segregated?
Can anyone give me an example of realtime start script in the graph?