Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is scour depth $ what's the process to determine it?

Answer Posted / iamrk1293

Scouring can be defined as a process due to which the particles of the soil or rock around the periphery of the abutment or pier of the highway bridge spanning over a water body, gets eroded and removed over a certain depth called scour depth.
Hydraulic Engineering Circular (HEC) has published a manual in which the methods are mentioned some of which are empirical equations or graphs to estimate the scour depth based on the discharge, flow velocity or flow depth etc.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

PL.tell me about civil engineering questions with answer

2481


What is the maximum strength of cub compress strength in one cub testing

1834


How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?

1739


How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

1999


what is the meaning of degreasing of the euipment or line.

3969


material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water

3615


How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?

6306


How you can turn off the display for dimension in CAD?

1020


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2810


column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial

3876


Define What materials were used to build the Golden Gate Bridge?

1064


Explain the various stages of the project planning process in construction?

1108


What is Joule Brayton Cycle?

1183


how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution

2106


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

1731