Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why we are maintain the gap voltage in vibration probe when installing time can explain me?

Answer Posted / kumaran

The EDDY current generates between the vibration probe tip and the shaft area. Increasing and decreasing of the area by the shaft will make the measurement of vibrations. So it needs to be done during the installation.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the calibration procedure for transweigh make weigh feeder?

4020


how will you segregate the alarm levels in alarm management system during factory Acceptance Test

2378


what is function of sensor, and how is it work , explain with difination

2375


Why do we have earthing cable in branch cable and shield in the same cable?

2599


can we create an interrupt in plc through scada?

2360


what is the reset offset and control system in instrumentation

3604


please send the sample qustion paper for iocl written test ..

3703


how will you check torque value during Factory acceptance Test for control valve/ESD ON/OFF VALE how will you confirm this torque value is being correct, Which document will you be refer.

2462


How works weighfeeders in cement industry? what is the working principle?

2031


Calibration procedure for Electro magnetic Flow meter

4475


what is the different between deflection type measurement and null type measurement in RTD?

1886


Yokogawa CENTUMVP R6.09 unable to download to Engineering Station with ExaOPC R3.75 The issue is when I try to download the common project section to the Engineering Station (STN) from the HIS in System View, it is unable to connect. The error displayed is: WARNING: Could not connect to equalize destination. (7001) Retrying. Number of retries = 0/1 ERROR: LdXopsLoadMain: connect error 10060 ERROR: Processing terminated due to connection error. (7002) Equalization end with errors. STN0149 ---- ERROR = 2 WARNING = 1 ---- Background: >Updated the ExaOPC software on the STN from 3.60 to 3.75 >STN operating system is Windows Server 2008 R2 >HIS operating system is Windows Server 2016 Stanard Solutions attempted include: >Ensuring all IP addresses are correct and all networked devices can be pinged. >The ability to ping a device using its host name from another device ( from HIS) >Ensure both devices firewalls are disabled. >The antivirus installed on the STN is disabled. >Ensuring both devices are within the same workgroup. >Added both devices to each other's Host and LMHost files. >Running IT Security tool after changing any administrative settings.

2184


Tell about your IFFCO plant visit.

2069


Why use ball valves on Gas pipelines instead of gate & or globe valves...means basic diffrence or use of these valves..how designers knows this type of valve with rating is required...

2336


Why upper weighing limit of electronics balance is 90% of the total weighing capacity?

2190