In one project how many shared containers are created?

Answer Posted / nams

only one shared container can be used in one project

Is This Answer Correct ?    2 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

client know skid info?

1630


Which is the best institute in Hyderabad to learn OBIEE and DataStage?Please tell me faculty name also

2740


WAT TYPE OF PL/SQL QUERRYS USED IN DATASTAGE

3261


What is the difference between account and directory options ?

618


How many types of hash files are there?

608






Difference between in process and inter process?

690


Name the third party tools that can be used in datastage?

610


How do u convert the columns to rows in datastage?

688


In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?

1040


What is the difference between hashfile and sequential file?

713


What are the different types of lookups in datastage?

622


create a job that splits the data in the Jobs.txt file into four output files. You will direct the data to the different output files using constraints. • Job name: JobLevels • Source file: Jobs.txt • Target file 1: LowLevelJobs.txt − min_lvl between 0 and 25 inclusive. − Same column types and headings as Jobs.txt. − Include column names in the first line of the output file. − Job description column should be preceded by the string “Job Title:” and embedded within square brackets. For example, if the job description is “Designer”, the derived value is: “Job Title: [Designer]”. • Target file 2: MidLevelJobs.txt − min_lvl between 26 and 100 inclusive. − Same format and derivations as Target file 1. • Target file 3: HighLevelJobs.txt − min_lvl between 101 and 500 inclusive. − Same format and derivations as Target file 1. • Rejects file: JobRejects.txt − min_lvl is out of range, i.e., below 0 or above 500. − This file has only two columns: job_id and reject_desc. − reject_desc is a variable-length text field, maximum length 100. It should contain a string of the form: “Level out of range: ”, where is the value in the min_lvl field. My Question is how do you write the stage variable for reject rows.

2185


What could be a data source system?

573


What is the Environment Variable need to Set to TRIM in Project Level?(In transfermer, we TRIM function but I need to impliment this project level using Environment variable)

1894


Hi guys, Please design a job for dis requirement with derivation(solution). my source table like dis. emp_no qualification 1 a 1 c 2 a 3 c 3 b To loaded to target like dis emp_no qualification 1 b 2 b 2 c 3 a my requirement is every employer have three qualifications i.e a,b and c. what qualification missed in source table that will be move to target systems. Hope u got it the requirement. Right Thanks.

2426