What is the use of PM02 control key??
Answer Posted / anvesh
PM02 is useful to send our spare parts outside to repair, it is useful for subcontracting process
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
For an equipment master record what fields need to be filled in?
What is planned maintenance?
You want to control the sap pm order type. How would you do that?
What configuration required in mm module for refurbishment process?
What is difference between corrective maintenance and preventive maintenance?
Differentiate between work center and main work center.
What is an ongoing maintenance?
How pm module is integrated with mm module?
What is concept of equipment numbering?
Explain the use of use of item number in maintenance order?
Why do you need an equipment and functional location both?
Which t code can give you the list of all pending preventive maintenance order for the coming month?
How is corrective maintenance different from breakdown maintenance?
What are different components under maintenance planning?
How to configure the integration of pp and pm, where it is being done in spro, what are the pre-requisite and what are the steps?