Answer Posted / venkat naresh racharla
They r two types of MRP
1) MRP :Material requirement planning
2) MPS : Master production schedule
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
How system calculate the actual cost?
Standard mrp steps
How to create PRT master record?
Explain 'mrp' (material requirements planning)?
Question related to Production order status or status profile?
How do you integrate HR (employee) with PP?
Can’t one material be assigned to more than one operation in a routine?
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
What is MRP Profile and MRP Group?
What is requirement class and requirement type?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
What does the use of ms70 followed by mcec get you?
Explain transaction code KO88 or CO88.
Have you used Pull list or back flushing in REM?