how calculate cutting length of stell in slab and column? give
brif discussion with formula?
Answer Posted / sahilshah.civil@gmail.com
Column floor to floor ht Say 3.0 m
Development length = Say 36 times diameter of main bar
Total length of One bar = 3+ Ld
Slab cutting length workout as follow
Base on slab supporting condition development length decided.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How to find CN by using arcgis 9.3?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
What do you mean by the word 'shear'?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
What is the density of DLC & PQC and how it is differ from normal concrete?
why is M30 grade Concrete use for Foothing & Column M50
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
how we calculate the grade of the Bituminous materials.?????
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?