How gate result to cube for 7 day?
Formula for the cube testing?
Answer Posted / ajmal khan
Days
--------------- X Fck
4.7+ 0.833 days
For Example M20 =
7
--------------- X 20
4.7+ 0.833*7
= 13.29N/sqmm. Aproximately 1/3rd of 20N.
We can find for any day of any grade.
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
What are the problems one might face while having a Cantilever balcony?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
what is the service corridor?
Sir how to find cutting length for footing steel bars in the shape of "u"
Define What is the origin of name Railway Sleepers?
How much 1 cum of M15, M20 & M25 concrete weigh?
How to make a c++ program that converts any base to base 10?
What is OSHA compliance?
what is the relation between pitch of steel and depth of slab?
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
Define What does civil status mean?
What is bylayer?