How gate result to cube for 7 day?
Formula for the cube testing?
Answer Posted / ajmal khan
Days
--------------- X Fck
4.7+ 0.833 days
For Example M20 =
7
--------------- X 20
4.7+ 0.833*7
= 13.29N/sqmm. Aproximately 1/3rd of 20N.
We can find for any day of any grade.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Why should pumping be not used in case of concreting work?
How to arrive dry volume of concrete (1.52 to 1.57) ?
what is the maximum number of course that can be laid according to IS code and the max height.
Basic questions of civil engineering
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
What is zoning permit?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What is the general specifications of a bituminous pavement road?
how lap length is increased with increase of Grade of steel?
How to calculate plastering for elevated water storage tank
What is specific gravity???
WHAT IS YOUR CURRENT SALARY
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
what is the water-cement ratio of mix design while 30mpa in 7 days?