Why reheater is not used after IP turbine.
Answer Posted / chinmay kumar patra(npti)
If we use re heater after IP than we can increase temperature not pressure so high enthalpy steam will not able to glide through turbine and it needs very bigger size LP turbine blades so vibration will be very high.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
what is the basic use of power plant in equipment
what is natural frequency of turbine shaft .
what's the moog valve
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
what is restricted earth fault explain in details
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
procedure of how to generate power in solar plant.
By any way can we increase the B check hours from 300 to 500
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
what is the difference between compensated & normal drum level in boiler drum?
what does mean by kva rating
explain how the third harmonic content of the magnetising current affects transformer design
can dp type level transmitter work in under vaccum condition
why airtel use + 24 volts and other operators use -48 volt