As per ratio 1:4:7, how can we calculate the quantity of materials for 1 cum of concreate, pls derive with equation
Answer Posted / mkumar
ratio 1:4:7,
sum= 12
total vo. of ingredient of using= 1.57
1x1.57/12=0.1301m^3
0.00013x1440=0.1883kg
0.1883/50 =0.0037bags cement
sand- 4x1.57/12= 0.5233m^3
aggregate- 7x1.57/12= 0.9158m^3
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
Wats the formula of eccentric footing and how was calculated from concrete qty
How can we convert weight batch to volume batch for m30 mix
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
What is the absolute pressure scale?
Define What is the distance between railway tracks?
How much is the cover for slab?
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
pls tell me , what is the water content
How you can turn off the display for dimension in CAD?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
Define What are the reasons for geotechnical site investigations in Uganda?
What out turn civil works
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
what is the maximum number of course that can be laid according to IS code and the max height.