Answer Posted / chinna
Planning file entry capatures the changes made to the material
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is processing class, where we do them and why?
How do you do capacity planning ?
Difference between PP and PI.
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
Difference between Manual reorder point and Automatic reorder point.
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
Explain Flexible planning Procedure?
Scheduling times can be defined in the material master record by?
What is end user training
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
What is group bom?
Why the work scheduling view is required for semi-finished and finished products?
• How are basic order dates determined?
Define ‘bom group’?
what are the problems you faced in MRP?