how much binding wire is required for one tone steel
Answer Posted / yogesh
5.4 kg of wire is required to tie an average tonne of bars
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
Which prize is the alternative to the NOVEL Prize?
what is the minimum cement content for M20 & M25 as per is code -456(2000).
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
why is M30 grade Concrete use for Foothing & Column M50
What is meant by solid geometry?
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
How to calculate material and labor required for 100 m2 plaster?
What are the different types of foundation?