what is the difference between site engineer & site incharge
Answer Posted / ameer
Site engineer responsible , he maintained more than 3 sites in particular area.
Site In Charge responsible, he maintained that particular one site, he managed the all works.
Is This Answer Correct ? | 2 Yes | 8 No |
Post New Answer View All Answers
What Reinforcements Are Used In The Process Of Prestressing?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
.5Ast
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
what are the types of dimensioning?
What do you mean by bond? What are the different types of bonds?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
what are the code used for residental building?
Please tell me vasthu room sizes. Thanks.
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
what is the criteria for the finalisation of pavement thickness in road project?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.