Answer Posted / dev
1.When you create a BOM for any material for any BOM usage the first alternative BOM will be created
that is 01.
2.Suppose if the same product can be produced using 2 different BOM's then you can create 2 BOM's
for that product,that's 2 alternative BOM 01 and 02.
3.This 2 alternative BOM's can be created for a different validity dates or lot sizes and it can be
assigned to a production version.
4.Always the first alternative BOM will be picked by the system during MRP run if they have same
validity dates and lot size.
5.In some case one BOM will be used for inhouse production and the other one for sub-contracting
purpose.
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
What is the difference between stock transport order and stock transfer order?
What is MRP Area or How can I excluede one storage location stock from MRP?
What is Production scheduling Profile and use of it?
What is 'mps' (master production scheduling)?
Explain why their is need of production version ?
Explain the mrp controller and their uses.
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
What is the planning horizon?
What do you mean by pooled capacity?
Can’t one material be assigned to more than one operation in a routine?
How mrp (material requirement planning) types are classified?
How are time management and payroll are integrated?
What is planned consumption and unplanned consumption?
Explain what is sap pp?
Do you have any idea about Capacity Planning?