adspace
Why attemperation is required in HRSG in a combined cycle
power plant?
Answer Posted / keyur donga
when the main steam temprature is goes high At varying load of the HRSG At this this time We maintain the Steam temp by using attempration in HRSG.
| Is This Answer Correct ? | 13 Yes | 0 No |
Post New Answer View All Answers