Why attemperation is required in HRSG in a combined cycle
power plant?

Answer Posted / keyur donga

when the main steam temprature is goes high At varying load of the HRSG At this this time We maintain the Steam temp by using attempration in HRSG.

Is This Answer Correct ?    13 Yes 0 No