Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why attemperation is required in HRSG in a combined cycle
power plant?

Answer Posted / keyur donga

when the main steam temprature is goes high At varying load of the HRSG At this this time We maintain the Steam temp by using attempration in HRSG.

Is This Answer Correct ?    13 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2559


LAPT working in alternator / generator

3643


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1930


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3266


what is the meaning of SST300 V56A in SIEMENS turbine

4371


explain how the third harmonic content of the magnetising current affects transformer design

3299


procedure of how to generate power in solar plant.

1962


what is the difference between compensated & normal drum level in boiler drum?

1818


How to calculate power press toneage

2079


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1013


what's the moog valve

1520


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2424


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1757


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2302


What is difference between secondary Air & Tertiary Air and Their use.?

2013