Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

I know chain keyword retreive records randomly but how chain
keyword exactly works internally????

Answer Posted / sandy

chain op code firstly set the file pointer to BOF(begin of file).then look for key or rrn which is specified in factor 1.
in rpg400 EX:
 Factor1          opcode        factor2                    Key/rrn           chain       file name/record format name

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

is this a rpg channel?

1216


what is an online rpg?

1323


what do you mean by an input subfile, what are the keywords required?

1305


How can we know running job is batch or interactive?

1183


can you debug ile rpg program using isdb?

1337


what is data area and how it is used in rpg program ?

1382


what is kids-rpg?

1176


What is the purpose of record level identifier?

1169


what is program status data structure?

2517


what is the procedure and explain about real time scenario.

2007


how do I preserve and clean the array?

1208


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

2304


do you use message subfiles? What are the necessary keywords required coding a message subfile?

1182


How to write record if no field or the field are different in physical file in rpgle ?

1023


Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.

2568