A can do a piece of work in 90 dAYS ,B in 40 days and C
in 12 days .they work for a day each in turn ,ie, first day
A does it alone ,B does it in the second day and C the
third day . after that A does it for another day and so
on . after finishing the work they get rs. 240. if the
wages are divided in proportion to the work done by
them ,find what each will get .. (********* PLEASE GIVE
THE EXPLANATION*****)
Answer Posted / kathir
ratio of their work is 12:27:81
so the amounts are 24,54,162
| Is This Answer Correct ? | 19 Yes | 2 No |
Post New Answer View All Answers
1/3 rd of the contents of a container evaporated on the 1 st day. 3/4 th of the remaining contents of the container evaporated the second day. what part of the contents of the container are left at the end of the second day.
the average of seven numbers is 2.5 then their product
What number should be added to or subtracted from each term of the ratio 17 : 24 so that it becomes equal 1 : 2.
Find the physical quantity represented by MOMENTUM * VELOCITY] / [LENGTH * ACCELERATION]?
The area of the quadrilateral is 36 What is a*b
A company manufactures x refrigerators cp.(9000+500x0 sp=500x; what must be the value of x so that atlas the amount gained After selling is equal to the amount spent on production
what is the exact qualifing marks for group 1 prelims
A man runs towards the east direction and then takes his right. Then he takes a left and again 50 degrees to his right. What is the direction in which he is moving now?
what is topic on pz cussons essay writing?
Gaurav buys milk at Rs. 60 per litre, adds water to it and then sells it at Rs. 75 per litre. What should be the ratio of milk to water to get a profit of 37.5%?
The time showed by the clock at a moment is 8 am then the respective time of after and before 42896 hours is :
f(X)= 2X-1 + f(X-1) if X is not equal to zeroandiff(X=0)=0, If f(X)= f(X-1)+f(X-2) for X>1 then X= ?
A can do a piece of work in 30 days, which B can do in 20 days. Both started the work but A left 5 days before the completion of the work. It took how many days to complete the work?
Find the correct meaning of the following phrase: To bite the dust
A finishes a work in 12 days and B finishes same work in 14 days.If they work for a day alternately with A beginning, how many days will it take to complete the work?