For 1:2:4 ratio the weight of cement is 50 kgs then how many kgs are the
weight of sand and aggregate
Answer Posted / uetian
weight of sand = 2/7 x 50 =14.28 kg
weight of aggregate = 4/7 x 50 = 28.57 kg
| Is This Answer Correct ? | 12 Yes | 11 No |
Post New Answer View All Answers
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
What is the strength of 1:6:12 mix?
how can we calculate steel value, depending on load
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
water leak detection system question & answer
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
I need to constructive work in amaraj batteries
What is Density of cement, sand & aggregate ?