Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why A.C. capacity given in Ton.
Ex. - 1.5 Ton

Answer Posted / jalaj

The air conditioner capacity is measured in terms of Ton or
BTU (British Thermal Unit). BTU refers to the amount of
heat energy required to raise the temerature of 0.45 kg
water by 1 degree Fahrenheit. 1 ton AC is equivalent to
about 12,000 BTUs.
1 Ton capacity means---The cooling produced by melting of 1
ton of ice in a day is
taken as unit of refrigeration (in tons). Now unit of
refrigeration used in S.I. System is KW.
1 ton of refrigeration
= mass of ice x latent heat of ice / 24 hrs
Every thing has scale to measure such as cloth is measured
in meter and weight is measured in kg.so a.c. capacity is
measured in ton and 1 ton refers to "It is the amount of
heat required to melt 2000 pond of ice into water of 32
degree farnehight during a period of 24 hours."

= 900 kg x 335 KJ/Kg ( one short ton = 900 kgs )
------------------
24 x 3600 secs
= 3.4895 KJ/Sec
say 3.5 KJ / Sec = 3.5 KW

that is 1 ton of refrigeration = 3.5 KW


The amount of the heat required to convert 1 ton (2000
pounds)of ice in to water within 24 hours. The initial
temperature of water is 0 deg C.

Latent heat of ice= 144 BTU

1 TR= 144 X 2000
= 288000 BTU/24

For 1 hour

We can divid by 24 So 288000/24=12000BTU



1TR=12000BTU/Hr
=3024 K Cal/Hr
= 12600 K Jul/Hr
= 3.52 HW OR K Jul/Sec

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we are using Load factor?

1949


how copper and aluminium wires or cables are choose for current rating? please provide copper and aluminium wire selection chart for different current rating ?

2032


3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.

2657


How can a equal potential zone be carried out in conductors?

1334


what is the saturation point of crgo lamination.

2231


Explain the operation carried out in thermal power stations?

1036


i want to know that what is the eligibility critaria for ongc exam?

3030


What is the difference between relays and contactor construction wise?

2246


What is the pro & con of having 11kv & 33kv incoming, and what is the adv & disadv. of converting from 11kv to 33kv.

2821


why magnetising curve not start with zero voltage?

2294


describe the A.C. Generator Testing procedure

2170


is it possible to turn on the single phase star delta on delay timer using 24 v dc ?

2042


what is breathing?

1813


List out the the types of Mounting Light fixture?

1607


I Need standard operation procedure(SOP)for 500kva Oil type transformer oil filtration & Procedure for IR value checking.

2893