What is the diffrence between FE 415 & FE 500 TMT BARS
Answer Posted / kumar
Question-
spouse u get below 1 meter cut bar, than how to define this is fe415 & fe500 steel bar.
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is the minimum size of the particles of silt soil?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
Why you are leaving present job?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
How cracks in concrete can be avoided?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
Describe the sections included in a typical bill of quantities
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
What are the strongest shapes in building?
what could be the production cost of 1 cum of concrete by CP30 plant
Please design 12.5m long dubbly beam
construction workers how much time take one work or qty
How to do base isolation using ETABS software?