Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how calculate cutting length of stell in slab and column? give
brif discussion with formula?

Answer Posted / raghavendra

check the length, width, depth and cover required for the slab further check the structural steel drawings for the bend and for the L are any other reinforcement clarification. then deducted the cover and add the bends and L to the given length and depth in case of slab and stirrups and total hight in case of columns gives the cutting length

Is This Answer Correct ?    19 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

4657


material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water

3656


What are the important hardware systems used for cad?

1156


i want texture painting pwd data

2064


Specific gravity of cement?

1637


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2548


.5Ast

1760


how to identify np3 pipe and np4 pipe

2039


Basic questions of civil engineering

2058


how to prepare site mix design

1937


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

2220


what is mc arther pile?

2244


How many % we consider for lap for reinforcement for estimates

1802


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

2295


How can you achieve soil enforcement?

1111