How to use value prompt and drag it on to report editor
Answer Posted / balaji
if we want to qualify on date or value while report running
we are using value prompts.
Like if we want the employees who hired before the date
24/06/2010. At these type of scenarios we are using value
prompts.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is static prompt in microstrategy?
how do you create schema objects in 2 tier connection?
What is microstrategy?
What according to you are the roles and responsibilities of a microstrategy developer?.
What are the different types of mstr objects?
What do you mean by bulk export report?
How is security handled?
1.Have u logical models in project? If s which logical model used? 2.how do u connect to production server? 3. how do u test the data in report is same as in DWH? 4. u created one report but there is no data in the attribute. But how can u extract the data from ware house? 5. u have two tables having different ids how do u merge those table in MSTR? 6. have u faced challenging situation in u r project? Give me one example?
Name the various types of filters?
What is the difference between microstrategy and cognos reporting tool?
What are the programs that we can do with the microstrategy architect?
What do you mean by staging area?
Can we access multiple operational databases from within a single microstrategy project?
Explain microstrategy logical primary keys?
What are consolidations?