HOW MANY EARTHINGS REQUIRED FOR GENERATER
Answer Posted / ajay kumar das
Normally minimum 4 earthing required .2 for body earth & 2 for neutral,But in case for 11 KV generation another 2 earth is required for L.A.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Is it possible to implement Restricted Earth Fault protection for a transformer without neutral CT?
HOW TO REDUCE POWER PLANT AUXILIARY POWER CONSUMPTION?
When we use 3 terminal resistor?
IN SINGLE PH TRANSFORMER IF LEKAGE IMPEDANCE DROP IS NEGLECTED ,THE FLUX IN THE MAGNETIC CORE and the lekage flux linking a winding are a)proportional to the applied v to the winding i respectively.
The metal-enclosed switchgear and controlgear is subdivided into three types: 1. metal-clad switchgear and controlgear; 2. compartmented switchgear and controlgear 3. cubicle switchgear and controlgear. What is the main differnence between them. State some example.
what is meant by flywheel and its role in retardation test
sir please tel me how calucalte kwh if home taken load 30ams how maney kwh taken per day.and 3phase motor 5hp per hars how maney load teken and how mach kwh and forward me to electrical table for calicalte kwh and kvr and kvah
What is the meaning of HT Trivector Meter ?
Will any motor burn if voltage provided is lesser than the rated voltage???? If yes, then how is speed control possible with voltage control
would the same effect be achieved by reversing the connection to one winding of the induction motor 3-phase?
What are the various kind of cables used for transmission?
is it possible to say motor horsepower number without seeing name plate(when name plate damaged)
What is distance between electrical panel to land ?
The principle of switching circuits for different types of batteries in application of storage systems
Assuming that a dedicated neutral earthing transformer is provided for each GT generator, when the two generators are running in parallel, has consideration been given that the earth fault current from one generator stator winding be split between the two neutral earthing transformers? If so, what adverse impact will this have on the operation of the 59N and 27TN devices?