how much quantity of cement and sand required for
construction of 10 cum brick work( Brick size
3"*4"*9"(Standard size ) an d for 10 cum construction of SSM
(Size stone masonary) with Cm 1:6 for both.
Answer Posted / karan bagga
lets the take size of brick is .230*.115*.075. now calculate
the quantity for 10 cum.
Area of one brick without mortar -0.00198375 Cum
No of brick in 10 cum= 10/0.00198375 (Area of bricks).
=5041 nos of bricks.
now calc. the bricks quantity in 10 cum with mortar.
lets take the mortar used 10mm in brickwork then
size of brick will be taken with mortar is =.240*.125*.085=
0.00255 (Area of one brick with mortar).
now in 10 cum brickwork no of bricks calculated with mortar
is=10/0.00255 =3922 nos
calculate the mortar in cum= bricks without mortar- bricks
with mortar= 5041-3922=1119 nos
Now area of brick without mortar is .230*.115*.075*1119=2.22cum
now 15% for frog filling and wastage taken in acc.
=2.22+2.22*15/100=2.55 cum
Dry volume is the 1/3rd of wet volume of mortar=
2.55+2.55/1/3=3.40 cum.
now the ratio is 1:6=7
3.40*14%=.486 cum cement
3.40*86%= 2.92 Cum Sand
=.486/.0347= 14.01 bags/10 Cum
= 14.01*6=84.06 Bags/10 Cum
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
The portion of a brick cut across the width is called?
rimmer in pile foundation
please briefly explain calculating or estimating steel quantity for a RCC column?
what is the weight of 12mm aggregates?
What was asked in isro civil interview
how clculate excavated or backfilling quantity by simpson's rule
what is called Bulk Density of aggregate?
What are the types of slump?
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
Howmuch bend to be provide for 200/600 BEEM
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
what is stressing
how to calculate reinforcment in staircase cranked beam?