Thirty men take 20 days to complete a job working 9 hours a
day. How many hour a day should 40 men work to complete the job?
(a) 8 hrs
(b) 7 1/2 hrs
(c) 7 hrs
(d) 9 hrs
Answer Posted / sanjeev kumar
since 30 men take 20 days to complete this job working 9
hours per day
so (30*9)/40
=27/4
= 6 3/4 hours
so option is not correct...
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
The number 0.05 is what percent of 20?
Find the next series number 1, 1, 2, 3, 6, 7, 10, 11, ?
A tailor has 37.5 metres of cloth and he has to make 8 piecesout of a metre of cloth. How many pieces can he make out of this cloth?
What amount of compound interest can be obtained on an amount of Rs. 4500 at the rate of 4% p.a. at the end of 2 years?
A string of alphanumeric is there. Find a string that starts with b and ends with 3 characters.
Two trains move in the same direction at 50 kmph and 32 kmph respectively. A man in the slower train observes the 15 seconds elapse before the faster train completely passes by him.
A person was fined for exceeding the speed limit by 10 mph.Another person was also fined for exceeding the same speed limit by twice the same. If the second person was travelling at a speed of 35 mph. find the speed limit
There are 3 societies a,b,c. a lent tractors to b and c as many as they had. After some time b gave as many tractors to a and c as many as they have. After sometime c did the same thing. At the end of this transaction each one of them had 24. Find the tractors each originally had.
a vendor solds two things at same cost 12 RS with one item at 25%profit and other at 20%loss,by this transaction he made profit or loss by how much
USA + USSR = PEACE ; P + E + A + C + E = ?
What number should be added to or subtracted from each term of the ratio 17 : 24 so that it becomes equal to 1 : 2.
The population of a city increases @ 4% p.a. There is an additional annual increase of 4% of the population due to the influx of job seekers, find the % increase in population after 2 years ?
Find the next letter in the series Q,W,E,R,T,--
If x,y,z are three consecutive natural numbers, which of the following numbers should be x+y+z
There is a work which can be completed by A with 12 days and B by 18 days. A and B works together for 3 days and B left. After that how many days for A to complete the work?