how much quantity of blocks, cement and sand is required to
complete 1sq.m of CC Hollow blockwork. Size-16"x8"x8". Also
what is the cement sand ration commonly used?

Answer Posted / s.dhote

how much quantity of blocks,cement and sand is required to complete 1sq.m of cc solid blockswork.size 2'*8"*8".also what is the cement sand ratio commonly used?

Is This Answer Correct ?    33 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)

1776


What are the responsibilities of a construction manager?

771


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

3529


How to determine thee cut length for steel reinforcement bars in R.C.C design

1052


why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure

1187






what is the construction cost for per cft of multistorryed building in kolkata?

1775


what is directivity effect?

1711


When column of building is abutting the boundary line,then suitable footing advised is

1940


How many types of slabs are there & how to design it?

751


what is meant by residual strain?

1787


what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?

1739


please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches

2105


50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?

1296


What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.

1841


How many axes do cartesian coordinate system has?

647