how much quantity of cement and sand required for
construction of 10 cum brick work( Brick size
3"*4"*9"(Standard size ) an d for 10 cum construction of SSM
(Size stone masonary) with Cm 1:6 for both.
Answer Posted / bhupendra potpose
Consumption & Rate analysis Brick Masnory 230mm 1:6
Superstructure With scaffolding
Providing and placing brick work 230mm 1:6 Superstructure
With scaffolding
1.3Ref: use 1..3 standard
Proportion of materials
Cement 1
Sand 6
Total 7
Std constant(1.5) / Total of proporttion(4)
0.186
1) Required volume of cement for 1 cum.
1 Proportion of cement 0.19
Add wastage(2.50%) 0.005
Vol of cement for 1 cum 0.190
0.035 is cum of per 50kg of bags 5.44.
As per standard we assumed that in 1cum of brick work ,the
quantity of mortor (Cement & Sand )is consider in
quantity. (24%) 1.28
Cost of cement per bags 325
Total cost of 1.34 bags 415.39
2) Required volume of Sand for 1 cum
2 Proportionof Sand 1.114
Add wastage(2.50%) 0.028
Vol of Sand for 1 cum 1.142
As per standard we assumed that in 1cum of brick work ,
the quantity of mortor (Cement & Sand )is consider in
quantity.(24%) 0.268
Cost of sand per brass 875
Total cost of 0.284 cum sand 234.85
3)Required brick for 1 cum of size 230x115x75mm
Actual Vol of one bricks is 0.00198cum,&
10 gap Allaround is become 0.00255
Nos of bricks in 1cum0.00255 1 392.16
Add wastage(10.00%) 39.22
Total Required brick for
1 cum 431.37
Cost of bricks 5.00
Total cost of brick 2156.86
A)Total material cost (1+2+3)
2807.10
4)Cost for Manpower ,Mixing ,Shifting ,
placing etc, Rs 15 / sft-Mumbai, 529.80
5) Cost for screeing,
cleaning ,of sand (10%) 333.69
6) Cost for Tools ,
Safety, curing etc(5%) 183.53
B) Cost of labour on
total material cost (4+5+6)
1047.02
C) Cost of Material & labour (A+B) 3854.12
5)Add over head(5%) 192.71
6)Add profit on(15%) 607.02
D- Total of (C+5+6),Over head & profit cost
P/A P230mm,1:6 Per Sqm. 4653.85
If the brick work is required to .
convert into Sqmt
1) for 230mm ; 0.23 1070.39
2) for 115mm ; 0.115 535.19
| Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
Does brick grows bigger every year?
Define What is the tallest man made structure in the world?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
Dear Sir What is the Contraction joint for base Slab
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
What is thumb rule for deep trench excavation
How can you produce desired alloys and discuss their applications in daily life.
how i can tak Quantity of mortar in block work
what is parametre for M25 after 7 days strength
sir please send me campus placement questions in civil engineering
what is pile and deam foundation
Explain what is Critical Path Method (C.P.M)?
what is mean by c32/40s concrete class
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft