How u will transfer LSMW data from development to production? And on which server u will test the LSMW data?
Answer Posted / irimi
Hi,
In LSMW, the system records the transactions you use in
creating master data (for example, MM01 - create material
master). In the process, you create a master data manually.
then you identify which fields you need for your upload
template. this is first done in a DEV environment and will
be transported later to your target environment.
| Is This Answer Correct ? | 8 Yes | 7 No |
Post New Answer View All Answers
What are the levels at which a batch number can be configured?
What is split valuation?
Explain how is the vendor return processed without a purchase order reference?
Pls guide me to choose to MM cource (SAP) in Mumbai or N. Mumbai
What is negative stock? Under what business requirement yout will recommend negative stock activation?
Explain the 'accounting' side of gr?
What are the different types of forecast model?
What is the difference between contract and scheduling agreement?
If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?
What are the important steps in the procurement life cycle?
Mention what are the data contained in the information record?
What are the main master files used in mm?
What are the lot size attributes a material can posses?
How to create movement type?
How do we assign material to vendors?