how much binding wire is required for one tone steel
Answer Posted / mohammad tariq
5-to 6 kg per ton binding wire required for foundation work
Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Differentiate first angle & third angle projection?
Mention what are the composition of a landfill?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
what pressure the NP2 class RCC pipe can sustain?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
Critical Path Method is...
Why should appointment store person for project ? what is the benefits for company ?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What is the use of extruded feature in solidsworks?
types of survey and levelling instrument ?