Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is FM200 Fire Supresion System??

Answer Posted / sandeep.sekharan@yahoo.com

Heat absorption is the main extinguishing property of FM 200 system and oxygen replacement is secondary.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Grid fault level [KA]?

2604


To prove the capacity of a 10MVA transforemr with 6.5% impedance by a short circuit test how much power is needed to inject an impedance voltage if we have to arrive for its rated current?

1921


What is the purpose of stablization resistor in high impedance bus bar protection

2002


What is the important precuations need tocarried out while working with Electrolite in Battery PM?

1902


What will happend if given Vfd out put to step up transformer

1816


Whether IP65 enclosure box blocks ventilation if driver for LED have to enclosed inside IP65 box

2082


It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.

3870


My load is 1635 KW. & current pf is 0.884, I have to improve it for 0.99.Please suggest what KVAR value is needed?

1587


sir please send me techinical questions for junior engineer posting in bangalore railway i am diploma holder

2096


BSNL TTA EXAM QUESTION

2171


what is the difference between earthing and unearth

3087


why do we put a transformer on soak before loading it

1140


what are the advantages disadvantages of connecting high voltage block( 1:1 transformers) transformers between the turbo generators and busbars.

2103


How dia computation perfomed in cold rolling mills .

3057


define the active power?

2012