if my 6 kva UPS gives 20 min. backup at 100 % load, then at
25% load what is the backup time?
Answer Posted / bibhu(bbb)
80min
100% load =20min
1% load=20*100 min
25% load=(20*100)/25min.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Somebody can explain me about >Critical Loops, calibrations, ESD critical Loop checks, Logic Diagram / Cause & Effect checks for ESD loops,
What is instrumentation instrumentation engineering?
Can anyone convert a 5/2 way or 3/2 way valve into an ISO valve?
Is it ok, to use non-contact type Radar type LT, on a tank that is half circular from the bottom side? If yes the, isn't the waves gonna bent in other directions?
Give 2 application of quartz crystal used for process parameter measurement.
in which principle pressure tx,level tx ,flow tx,temp tx ,control valve works?
how to change measuring units from mmwc to cubm/h in rosemount air flow transmitter with hart communicator fluke 744
How to calibrate an pressure gauge with yantrika test bench?
What is heating effect?
How to calibration coriolis flow meter?
send me HPCL paper
How can you add value to this Industry if offered the job?
types of cable..? Use of every types of cable..?
please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com
selection of the zener barrier for the hazardeous area zone 0