1.how to calculate 4*3 runner qty in cft.
2.how to calculate the nails qty.(column,beam,slab)
3.if any formula for binding wire qty calculation.
Answer Posted / ratheesh
1. First you have to convert inches to feet, 1 inch =
.083feet, Then u have to multiple length, breadth & width.
2. approximate .750grms to 1kg for 1 sqm shuttering.
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
how to workable concrete cube test M-25 design mix
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
What are the skills required to become an architect?
why are you joining in this (applied post) job and your aim for this job
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
Critical Path Method is...
please send me bhel questions on rupesh.017@rediffmail.com
Concrete cover for slab, column, beam and footing?
How to testing voids of filled aggregate in bitumen mix design
What is the l/d ratio of cantilever beam?
it is a corrected question." make a list of engineering property(properties) of soil.
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
what is the minimum cement content for M20 & M25 as per is code -456(2000).
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?