DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / o.ravindra reddy
A-Check Daily basic
B-Check 250-300hrs and 6months
c-Check 1500hrs and 1year
D-Check 6000hr cycle
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
is there any chart showing the suitable cable size according to AMP and length ? for three phase motors
Which is the largest hydropower station in the world?
which is the best institute for PLC,SCADA,DCS in hyderabad
Discuss about gear cutting machines.
The synchronous machine excitation system explain
model question paper for supervisor trainee
do anyone out there know where to find a compleete list on acronyms/abbreviations used in offshore electric engineering. MCB - Micro Circuit Breaker, MCCB-Mouldes Case Circuit Breaker, ELCB-Earth Lekage Circuit Breaker, ELMCB- etc.....
what is basic difference betmeen normal & flame proof motor??
How to calculate total harmonic distortion level(THD) in VFD? and how can we reduce harmonics?
what irequirment need to be followed when working on live equipment
In the ACB breaker capacity is 2000Amp but this each phase taken 1250 But total beldibg load is 600amp or 700amp watt is the problem
what is RFCT and Insulgard Relay & It's function?
How to calculate the multiplying factor for energy meter with ct ratio given
How much minimum insulation required between 11kv/3.3kv transformer windings?
Connection diagram for KW meter and Kva meter