In a thermal power plant ID Fans running with full load but
boiler load is only 80 % give reason ?
Answer Posted / mohamed elnakib
it is due to the air preheater being clogged increasing the
load of the ID fans due to the bad suction and this clogging
is mostly due to the baskets being melted due to the
formation of the ACIDS from the exhaust gases and the dew
point effect .
this is the only logical reason for why the ID fan is 100%
loaded while the boiler is not .
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
what does mean by kva rating
LAPT working in alternator / generator
By any way can we increase the B check hours from 300 to 500
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
why do you consider yourself a suitable candidate for this position
procedure of how to generate power in solar plant.
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
what is the basic use of power plant in equipment
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.
why airtel use + 24 volts and other operators use -48 volt
what is the trip circuit supervision in an electrical meaning?
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
what is restricted earth fault explain in details
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....