Answer Posted / vijay
1.First create the formula papameters which is used in formulas
2.create the formules using formula parameters
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What are the basic dates?
What are all the settings done for configuring the integration of pp with fico?
What is phantom item & sub contracting
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
Explain the process of Material costing.
What is costing? How it is affected the pp?
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
how many times pcc can run for one material?
How is time management and payroll is integrated?
What is MTS and MTO and the difference between them?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
Why work scheduling view is required for semi-finished and finished products?
Explain service level agreements
How does sap know that an operation has components as indicated by the component allocation indicator?