I want to process that order again can I do it?
Answer Posted / ajit kumar santi
First thing is that Technically closed is word.
Technically complete (TECO)is a status and Closed (CLSD) is a status.in case of TECO you can revoke TECO right there.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How can I use variable size items?
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
list the important tables used in pp.
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
List out the activities carried out in production planning?
Explain customer Independent requirement .
What is planning horizon?
What is recursive BOM
What is meant by payscale structure?
what do you mean by opening periods
What is scheduling
How can you get planned orders scheduled so that you can do capacity leveling ?
What is scope of planning?
In lsmw which is most important step?
Integration between PP and PM module.