1.I have a Batch job, Running for 4 hours, i want to reduce
the executing time to 2 hours what should you do?

Answer Posted / anil kumar.anumulasetty

we have to create multiple threads in the job. when we
submit the job ,multiple threads will run parallelly. so it
will take very less time to complete the job. This is the
best way I believe.

Please let me know if there are any suggestions.

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

do you use message subfiles? What are the necessary keywords required coding a message subfile?

687


what is an online rpg?

725


What is a record lock error?

1265


How would display prime numbers using CL program?

5679


Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?

517






How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique

548


Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.

2051


What is the purpose of record level identifier?

728


Suppose we have one database file and it is used by 5 programs and in 3 program we have to add some records in datbase file s what is the impact on other program?

1455


Explain mdt?

665


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1761


how do I declare a minor?

716


1.Load an runtime array of length 99 from the pf and you want to handle all the possible errors?

2373


Set on command is used for closed all opened files , initialize var and release resource , return cmd is used for return to calling program but my req. Is dnt close opened files and resource must released while doing transactions , how can i do this...?

1462


how can I tell when to replace the array?

702