what are the differenc between vcb and sf6 breakers
Answer Posted / jayakumar v
VCB MEANS VACUUM CIRCUIT BREAKER 11 TO 33 KV IS APPLICABLE.
INSIDE OF THE BREAKER HAVING AN ONE VACUUM INTERRUPTER WITH CONTACTS. HERE VACUUM IS AN ARC QUENCHING MEDIUM. INSIDE OF INTERRUPTER VACUUM HAS BEEN CREATED BY MECHANICALLY (MANUAL) OR ELECTRICALLY(THROUGH DC MOTOR).
SF6 BREAKER MEANS SULPHURHEXA FLUORIDE BREAKER. IN UPPER SIDE OF THE BREAKER HAVING AN GAS POLE ASSEMBLY. INSIDE OF THE POLE ASSEMBLY HAVING AN MALE & FEMALE CONTACTS. ALWAYS MAINTAINING 3.8 Kpa PRESSURE INSIDE OF POLE FOR 33 KV LINE.THIS BREAKER RANGES UPTO 750KV.
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
What would be the size of wire used for 2 Ton of window A.C?
my name is venkat .i have good percentage in my academics(ssc 86, intermediate 83 b.tech 73) my question 1..after completion of my ssc i joined in bpc but i didnt got rank in emcet so i completed MPC in one year compartmentally ..so here what am expect question from this background?
why we change the direction of winding in rotor ?how we make the north and south pole?
How to know vacuum in vacuum cylinder of breaker in working condition
What is FM200 Gas??Applications........
how to copy from plc ge fanuc versamax series,all input and output, adress, and printout.
What tests should i carry over on a newly rewinded DC Generator with voltage rating of 38 volts and current rating of 350 amps, to certify that the machine is OK?
if there is nutral in phase why we use earthing wire and grounding? even at fault condition the fault current flows to neutral (it is a lower path)
how we can set the IDMT relay.
Readings of ER300P Trivector meter
how to get electrical supervisour certificate in gujarat
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
how the phase convertor changes the no. of phases
What is zero of the system?
Is a contactor (or master relay) required between incoming lines and a VFD? The question goes to safety. If a contactor were used before the VFD and an e-stop engaged then the motor will coast to a stop (i.e. VFD loses power) instead of stopping much faster if the VFD braking fucntion were used. It would make more sense to keep power on the VFD.